Contractor Quote Comparison

Line two to four contractor quotes up against your own scope list — demolition, materials, labour, permits, warranty — and see each total for what it is: which lines every quote prices, which lines only one of them mentions, and exactly where the gap between the cheapest and the dearest quote comes from.

Nobody gets three quotes for the same job. They get three quotes for three slightly different jobs that happen to share an address. One contractor prices the permits inside the labour line. Another leaves the haul-away to a line that never made it onto the page. A third quotes materials with an allowance so thin it is really a second bill scheduled for later. Then the homeowner compares the three totals, picks the middle one, and discovers the differences during the work — which is the most expensive possible time to discover them.

Three quotes for the same kitchen, three different totals — and no honest way to tell which one is actually cheaper, because each contractor priced a slightly different job. One folded the permits into labour. One left the haul-away out entirely. One listed the warranty, two never mentioned it. This page lines the quotes up against your list of what the job includes, so the totals stop lying: you write the scope lines once, type each quote in against them, and the page shows where every dollar of difference sits and which lines each quote never mentions.

This page compares numbers, not contractors. It does no background check, verifies no licence and rates nobody's work. Whether a contractor is licensed and insured, and whether a written warranty can be enforced, varies by state and city — check those with your local licensing board, not here. What the page does is arithmetic: it aligns the quotes you received so the differences become visible and askable.

Currency

Used for every amount on the page. Enter all quotes in one currency — the page does not convert.

Your scope lines, and the quotes against them

The first column is your list of what the job includes — it starts with the lines most home quotes are built from, and every line can be renamed, deleted or added to. Then work across: for each quote, type the amount that quote puts on the line. Enter 0 when a quote covers the line at no separate charge (a warranty included in the price, say). Tick Not listed when the quote never mentions the line at all — that is the gap this page exists to catch. A cell left blank counts as not listed too, so once a quote is fully typed in, every line it never mentions shows up in the lists below.

Nothing you type is sent anywhere or saved — no account, no upload, no storage, and no share link, because quotes name your project and your money. Refresh the page and every figure is gone, so print the comparison if you want to keep it.

⚠️ Comparison of figures only. This page adds up and aligns the numbers you type; it does not check any contractor's licence, insurance, reputation or workmanship, does not recommend one quote over another, and cannot tell you whether a price is fair for your area. Licensing, insurance and warranty rules vary by state and city and are enforced locally — verify them with your local licensing authority. “Not listed” means a line does not appear in a quote's text, not that the work will not be done. Nothing you type is sent anywhere or saved.

Quick answers

How do I compare contractor quotes fairly?

Fair comparison needs one shared scope. Write down every line the job includes — demolition, materials, labour, permits, cleanup, warranty, payment schedule — then check each quote against that list line by line: what it charges, what it covers at no separate charge, and what it never mentions. Only totals built from the same lines can be compared; a quote that skips two lines is not cheaper, it is shorter.

The matrix above does exactly this. Lines where the quotes disagree are marked, each quote's missing lines are listed separately, and the widest total gap is decomposed so you can see how much of it is price and how much is coverage.

Why is one contractor's quote so much cheaper than the others?

Usually because it prices less work. The common causes are lines missing entirely (permits, disposal, cleanup), thin allowances for materials that will be re-billed at real prices, and labour quoted without the preparation or finishing steps the dearer quote includes. A genuine price difference exists too — lower overhead, a quieter order book — but it can only be identified after the coverage difference is stripped out.

That stripping-out is what the gap breakdown is for: lines only one quote lists are counted separately from lines both quotes price differently. The first kind is not a saving. The second kind is worth negotiating.

What should a contractor quote include?

An itemised breakdown against the job's scope: demolition and disposal, materials with named specifications or allowances, labour, permits and inspections, site preparation and cleanup, the warranty terms in writing, and a payment schedule tying each payment to a finished milestone. A single lump sum with no breakdown is not yet a quote you can compare — ask for it split by line before you sign.

The starter lines in the tool are that list. If a contractor will not break a lump sum down, type the whole sum on one line and leave the rest not listed — the output will show, plainly, how much of the job the document in front of you actually promises.

How to use

  1. Step 1: edit the scope lines until the first column is your job — rename the starter lines, delete the ones your project does not have, add the ones it does (underfloor heating, scaffolding, a skip bin). This list is the ruler every quote gets measured against.
  2. Step 2: name the quotes (the contractor or company name works — it stays on this page only) and type each quote in against the lines: the amount it charges, 0 where it covers the line at no separate charge, or the Not listed tick where the quote text never mentions the line.
  3. Step 3: read the totals with their line counts. A total over 9 of your 10 lines and a total over 6 are prices for different jobs; the lower one is not yet a saving.
  4. Step 4: read the gap breakdown for the widest pair. Note which lines are price differences (both quotes price them, differently) and which are coverage differences (only one quote lists them). Negotiate the first kind; clarify the second kind.
  5. Step 5: work through each quote's not-listed lines and the generated questions, ask them, and type the answers back in as new amounts or zeros. When every quote prices the same lines, the totals finally mean something. Print the comparison to keep it — nothing is saved.

About this tool

This tool exists to move that discovery earlier, to the kitchen table, where it is still free. It works backwards from how quotes go wrong: instead of asking a computer to guess how three differently-worded documents line up — they never line up cleanly, and a wrong guess is worse than none — it asks you to write the scope once, in your words. Your list of what the job includes becomes the rows. Each quote is then typed in against those rows: the amount it puts on the line, a 0 if it covers the line at no separate charge, or a tick if it never mentions the line at all.

What comes out is the picture the totals were hiding. A matrix shows coverage at a glance, with the rows where quotes disagree marked. Each quote gets a list of the lines it never mentions, in deliberately neutral words — “not listed in this quote — worth asking about” — because a missing line usually means folded-in or forgotten, not dishonest, and the question is cheap either way. The widest gap between two totals is taken apart line by line, so you can tell a real price difference from a coverage difference wearing a price difference's clothes. And the page turns the gaps into a printable list of questions, because the point of finding a missing line is to ask about it before signing, while asking still changes the contract.

What the page will not do is pick a winner. The lowest total is reported as a fact, next to the reminder that a quote can be lowest because it lists the least; beyond that, judgement about workmanship, reliability and fairness stays with you and with the checks only you can run — licence and insurance verification with your local board, references, the contract itself. Sibling arithmetic for the same projects lives nearby: the concrete calculator for volumes, the paint calculator for coverage, the stair calculator for rises and runs, and the appliance running cost calculator for what the finished room will cost to run.

How it works

Quote total: the sum of the amounts entered for that quote across your scope lines. Lines ticked “not listed” and lines left blank contribute nothing — which is precisely why a total is only ever a total of the lines that quote lists, and why the page always shows the line count beside it.

Coverage of a line: a line counts as covered by a quote when an amount is entered for it — including 0, which means the quote covers the line at no separate charge. It counts as not listed when the Not listed box is ticked or the cell is blank.

Line difference between two quotes: when both list the line, the absolute difference of the two amounts. When only one lists it, the whole listed amount counts as a coverage difference. When neither lists it, it contributes nothing to the gap — and belongs on the questions list instead.

Widest-gap breakdown: the pair of quotes with the largest total difference is decomposed into its lines, largest contribution first. The sum of the line contributions equals the total difference exactly; nothing is rounded away or apportioned.

What this tool can’t do

The ruler is your scope list, and it has the same blind spots you do. A line nobody thought of — asbestos testing in an older house, say — appears in no quote and therefore in no output. The tool aligns the job as you defined it; it cannot define the job for you.

Contractors use the same words for different bundles. One firm's “materials” includes fixtures and finishes; another's stops at timber and board. The matrix aligns amounts under your line names, but only the follow-up questions can establish that two amounts on one line buy the same thing.

Amounts are typed in by hand from paper or PDF quotes, and transcription slips pass straight through. A total that looks wrong is worth re-checking against the document before it is worth arguing about.

The page knows nothing about quality. It cannot see that one contractor's labour line buys a licensed crew and another's buys whoever is available, and it offers no view on whether any price is fair for your city — local labour and permit costs vary too much for a general page to judge.

Figures must be entered in one currency, and quotes written at different times may embed different material prices. The page does no conversion and no inflation adjustment.

Worked examples

The kitchen with three totals: A kitchen refit draws quotes of $18,450, $15,900 and $21,300. Typed against ten scope lines, the $15,900 quote lists only seven: permits ($650 on the other two) and cleanup & haul-away ($480) never appear, and its materials line is an allowance of $4,000 against $6,600 and $7,100 on the others. Most of its $2,550 “saving” against the middle quote is work it has not priced. The genuinely negotiable difference turns out to be labour, where it is $900 under — a real gap, and a much smaller one than the totals advertised.

The bathroom where the dearest quote wins the argument: Two bathroom quotes differ by $3,800. The breakdown shows $2,900 of it on one line: waterproofing, which the cheaper quote does not list at all. Asked about it, the cheaper contractor says it is “in the tiling” — possible, but now it gets written into the contract as a named line at $0 extra, or priced openly. Either outcome is better than discovering the arrangement after a leak. The remaining $900 is a straight labour difference, negotiated in ten minutes once it is the only thing left to discuss.

The lump sum: A roofing quote arrives as one line: $11,750, “all in”. Against an eight-line scope — tear-off & disposal, underlayment, shingles, flashing, ventilation, permits, cleanup, warranty — it can only be entered as a single amount on one line, with the other seven not listed. The output is not an accusation; it is a shopping list for one phone call: ask for the split. Contractors who price carefully can usually produce it in minutes, and the split is what the signed contract will be enforced against.

The starter scope lines, and what each one pins down

The seven starter lines are the skeleton most home quotes are built from. None of them is a standard anyone certifies — contractors bundle work differently — which is the point of editing the list before you type a single amount: the lines below are a starting draft of your job, with the question that pins each line down.

Scope lineWhat it usually coversThe question that pins it down
Demolition & disposalTear-out of what is being replaced, and getting the debris off the property.Does the price include the skip or haul-away, and disposal fees?
MaterialsEverything that stays in the finished job — named products, or an allowance to choose against.Which items are named brands and which are allowances — and what happens when the real choice costs more than the allowance?
LaborThe crew's time, including preparation and finishing if the quote says so.Does labour include prep and making good, or only the headline work?
Permits & inspectionsPermit fees and the inspections the city or county requires.Who applies and pays for permits — and is that inside this price or on top of it?
Cleanup & haul-awaySite protection during the work and a clean handover at the end.Is daily protection of floors and furniture included, and what state is the site left in?
WarrantyThe written promise behind the work — what it covers and for how long.What exactly is warranted, for how long, and where is it written in the contract?
Payment schedule & depositHow much is due, when, and against which finished milestones.Is each payment tied to completed work — and is anything due before the work it pays for exists?

Licensing, insurance and warranty enforceability are local matters: they are set and enforced by your state or city, not by any website. Verify a licence number and an insurance certificate with your local licensing board before work starts — this page compares figures only and runs no check on any contractor.

Frequently asked questions

Should I just pick the lowest total?

This page will not pick for you, and the lowest total is the one figure on it to trust least on its own. A quote can be lowest because it is efficient, or because it lists the fewest lines, the thinnest allowances, or a warranty it never writes down. Compare the totals only after every quote prices the same lines — then the lowest total is at least a price for the same job, and the remaining judgement (references, licence, the contract's wording) is yours to make.

A quote covers a line inside another line's price. How do I enter that?

Enter 0 on the covered line. Zero means “covered at no separate charge” and counts the line as listed, which is exactly right: permits folded into labour are still permits, priced and promised. Reserve the Not listed tick for lines the quote genuinely never mentions. If a contractor tells you a line is included verbally, the 0 is worth asking them to confirm in writing — the questions list phrases it that way.

What if a contractor refuses to break down a lump sum?

Enter the lump sum on one line and leave the rest not listed; the comparison will show what the document promises and what it does not. A lump sum is not automatically a bad quote — small, simple jobs are often priced that way fairly — but for a multi-week project the breakdown is what you will hold the work to, and most established contractors can produce one. What you do with a refusal is a judgement call this page deliberately leaves to you.

Does “not listed” mean the contractor is cutting corners?

No, and the page words it carefully for that reason. Not listed means the line does not appear in the quote text — nothing more. Contractors fold lines into each other, work from their own templates, and sometimes simply forget the line everyone forgets (haul-away is the classic). It becomes a problem only if it stays unasked: a line nobody priced has a way of appearing on the final invoice at a price nobody negotiated.

Does this page check licences, insurance or reviews?

No. It never looks any contractor up and holds no data about any business. Licensing and insurance are enforced by your state or city, and the only reliable check is with that authority — ask each contractor for a licence number and a current insurance certificate, then verify both with the licensing board. Reviews and references are yours to gather the same way. This page handles the one check a spreadsheet-shaped tool genuinely can do: whether the numbers in front of you describe the same job.

Is anything I type saved or sent anywhere?

No. The scope lines and amounts live in this tab's memory only: no account, no upload, no storage, nothing passed to analytics or any third party, and no share link — quote figures name your project and your budget, and do not belong in a URL. Refreshing or closing the page clears everything, which is why the comparison and the questions print.

📦 Embed this tool on your site

<iframe src="https://verystep.com/embed/contractor-quote-comparison/" title="Contractor Quote Comparison" width="100%" height="520" loading="lazy" style="border:0"></iframe>