NPV Calculator
Net present value of a cash-flow sequence at your discount rate, with a per-period table.
Net present value restates every future cash flow in today’s money by dividing the flow in period t by (1 + r)ᵗ, then adds the lot. At a 10% rate the sequence −1000, 500, 500, 500 discounts to 454.55 + 413.22 + 375.66 for the inflows, giving NPV ≈ 243.43 — positive, meaning the inflows beat a 10%-per-period benchmark in today’s terms, while the same flows undiscounted sum to 500, which is the number that flatters every multi-year proposal by ignoring time. At a 0% rate this page returns that plain sum, which is the quickest sanity check on the setup.
The first flow is treated as happening today (time 0) and is not discounted; each later flow is divided by (1 + rate) raised to its period number. The periods must all be the same length as the rate’s period — a yearly rate with monthly flows silently produces a wrong answer, here as everywhere.
Quick answers
How do you calculate NPV?
Discount each flow back to today and add them: NPV = Σ CFₜ ÷ (1 + r)ᵗ, with the time-0 flow undiscounted. At 10%, −1000 + 500 + 500 + 500 over three periods gives ≈ 243.43.
The discount rate and the flows must use the same period length. A positive NPV means the sequence beats the benchmark the rate represents; it is arithmetic on your assumptions, not a valuation guarantee.
What is the difference between NPV and IRR?
NPV gives a currency amount at a rate you choose; IRR gives the rate at which NPV would be zero. NPV answers “how much value, at my required return?”, IRR answers “what return makes it break even?”.
When the two disagree on ranking projects, NPV is the safer arbiter because it respects scale; the IRR page on this site covers the multi-root and reinvestment caveats in detail.
How to use
- Enter the discount rate per period, in percent — the rate must match the spacing of your flows (yearly rate, yearly flows).
- Type the cash flows in time order: the time-0 flow first, which is not discounted, then one per period.
- Read the NPV headline, then audit it in the table: each flow, its discount factor and its present value.
- Try a second rate to see the sensitivity — NPV falling through zero as the rate rises traces out the project’s IRR.
About this tool
NPV is only as honest as its two inputs. The discount rate is a judgement — your cost of capital, your required return, a policy rate — and small changes swing long sequences hard, which is why the per-period table is shown in full rather than hidden behind the headline. The flows themselves are forecasts, and no precision in the discounting lends them accuracy. One mechanical rule causes most real-world NPV errors: mismatched periods, such as an annual rate applied to monthly flows. Keep the rate’s period and the flows’ spacing identical, treat the output as arithmetic on your assumptions rather than a valuation verdict, and do not read it as investment advice.
Frequently asked questions
What NPV does −1000, 500, 500, 500 give at 10%?
About 243.43 (243.426 before rounding): −1000 + 500÷1.1 + 500÷1.21 + 500÷1.331 = −1000 + 454.55 + 413.22 + 375.66. The table under the result shows each discounted flow so you can follow the arithmetic.
Is the first cash flow discounted?
No. The first flow is time 0 — today — so its discount factor is exactly 1. Every later flow is discounted by its own period number. If your first real flow arrives one period from now, enter a 0 in the time-0 position or start the sequence with the initial outlay, as the examples do.
What discount rate should I use?
The rate that represents your alternative: the cost of capital for a company, a required return for an investor, sometimes a risk-free rate plus a risk premium. There is no correct universal number — which is precisely why you should run the calculation at two or three rates and look at the spread before deciding anything.
What does a negative NPV mean?
That at this discount rate, in today’s terms, the outflows outweigh the inflows — the sequence underperforms the benchmark the rate represents. It is a statement about the rate as much as about the project: every invest-then-receive sequence has some rate (its IRR) at which the NPV is exactly zero.
First time embedding? Read the step-by-step guide →
More free tools
Percentage Calculator
Work out percentages, increases and discounts in one click.
Age Calculator
Find your exact age in years, months and days.
BMI Calculator
Check your Body Mass Index in seconds.
Tip Calculator
Split the bill and work out the tip in seconds.
Discount Calculator
See the sale price and how much you save, instantly.
Scientific Calculator
Full scientific calculator: trig, logs, powers, factorial. Free, private, runs in your browser.