Verystep Guides Verystep Guides
Read the AQL Table Before You Write It Into a Purchase Order
A sampling plan you only agreed on verbally gets tested three different ways β by you, the factory, and the inspector. Write the numbers into the PO first.

You don't start with the AQL table. You start with two facts: how many units are in the lot, and which defects count as critical, major, or minor for your product. From there the path is fixed. Pick an inspection level β General Level II is the default most buyers use. The lot size and level give you a code letter. The code letter gives you the sample size. Then set an AQL per defect class and read off Ac and Re, the accept and reject numbers. Write all of it into the purchase order, and everyone inspects against the same plan.
Before the table: lot size and defect classes
Most PO disputes about quality start in the same place. Nobody wrote the plan down. The factory inspected one way, your inspector another, and you're reading the report on a video call at midnight wondering whose numbers count.
So start before the table. First, the lot size: the number of units the inspector will treat as one lot. That's usually the full shipment quantity for that item β not the number of cartons, and not a mixed order total. Second, sort the defects you care about into three classes. Critical defects make the product unsafe or unusable β a sharp edge, a wrong voltage, a broken seal. Major defects hurt function, or look bad enough that a customer sends the item back. Minor defects are small cosmetic flaws most buyers accept at some rate. You can't set an AQL until you've decided which failures fall in which class, and that call is yours, not the factory's.
The steps, in order
Open the AQL Calculator, or the printed ANSI/ASQ Z1.4 tables β the same system as ISO 2859-1 β and work down this list. Don't skip steps. Each one feeds the next.
- Write down the lot size and split expected defects into critical, major and minor classes before you open any table.
- Set General Inspection Level II unless you have a clear reason to use Level I for cheap, low-risk goods or Level III for high-risk or disputed lots.
- Find the code letter for your lot size at that inspection level in the sample size code letter table.
- Read the sample size from the code letter, because the plan samples by code letter, not by lot size alone.
- Set an AQL for each defect class, starting from critical 0, major 2.5 and minor 4.0 unless your product needs tighter limits.
- Look up Ac and Re for your sample size at each AQL, and note that you accept at Ac or below and reject at Re or above.
- Write the full plan into the purchase order in words β inspection level, the AQL for each class, the code letter, the sample size, and Ac and Re for each class.
Worked example: 500 units, Level II
Say you're ordering 500 units of a kitchen gadget. Lot size: 500. You stay on General Level II β no dispute history, and the product isn't safety gear. In the code letter table, a lot of 500 at Level II lands on code letter J. Code letter J means a sample of 80 units. Not 80 cartons. 80 units, pulled at random across the lot.

Now the AQLs. Critical is 0 β the plan accepts on zero critical defects, so one dangerous unit in the sample fails the lot. Major is 2.5. At a sample of 80, the table gives Ac 5, Re 6: up to 5 major defects in the sample and the lot passes, 6 or more and it fails. Minor is 4.0, which allows a few more cosmetic flaws before the lot fails. Those numbers are the whole plan, and they fit in two lines on the PO.
When the result comes back
Here's a thing buyers get wrong. They expect a grey zone. There isn't one. Single sampling plans have no score between Ac and Re. If the defect count sits at or below Ac, the lot passes. At Re or above, it fails. Ac 5 and Re 6 are neighbors on purpose β 5 passes, 6 fails, nothing in between to argue about.
What you do with a failed lot is a commercial call, not a table lookup. You can reject it, ask for a re-sort and fresh inspection, or accept it at a discount if the defects turn out minor in practice. Just decide from the report in front of you, class by class. A lot can pass on majors and still fail on one critical defect, and that one critical is the result that matters.
Mistakes that cause the arguments
Skipping the plan in the PO is mistake one. Mistake two is picking the sample size by feel β "check 30 pieces" β which quietly throws away the whole system, because Ac and Re only mean something for the sample size the code letter gave you. Mistake three: one AQL for everything. Set 2.5 across the board and you've just told the factory that a safety defect and a scuffed box carry the same weight. They don't.
Watch the inspection level too. Level I samples less, so it's cheaper and quicker, and it separates good lots from bad ones less sharply β fine for low-risk repeat orders with a supplier you trust. Level III samples more and discriminates harder; use it for high-risk products or after a bad shipment. And sample randomly. If the factory stacks the good units on top and your inspector only opens the top cartons, the math never stood a chance.
The Verystep AQL Calculator does the table lookups for you: enter the lot size, pick the inspection level, set an AQL per defect class, and it returns the code letter, sample size, and Ac/Re for each class. Run it while you draft the PO, then copy the plan into the order word for word β two minutes that save a dispute later.
Last verified November 14, 2026 β code letter, sample size and Ac/Re values checked against ANSI/ASQ Z1.4 / ISO 2859-1 Table II-A, single sampling plans for normal inspection.
Frequently asked questions
What AQL should I use if I have no idea where to start?
Start with the preset most buyers use: critical 0, major 2.5, minor 4.0, at General Inspection Level II. It's the middle-of-the-road plan for ordinary consumer goods. Tighten major to 1.5 or 1.0 for premium products where returns hurt; loosen minor to 6.5 only for cheap goods where small cosmetic flaws really don't matter.
Can I just inspect 10% of the lot instead?
You can, but you lose the link between sample size and Ac/Re. The tables set the sample from the code letter, and for a lot of 500 that's 80 units β 16%, not 10%. A flat percentage oversamples tiny lots and undersamples big ones. Use your own percentage and you're running a homemade plan with no standard behind the accept numbers.
Does AQL 2.5 mean my lot has at most 2.5% defects?
No. AQL 2.5 is the quality level the plan is built to accept most of the time, not a promise about your lot. A lot sitting right at 2.5% defective still fails now and then, and a worse lot slips through occasionally. The plan manages risk. It doesn't certify a percentage. Run your numbers in the calculator to see the Ac/Re you're actually committing to.
Should the factory get the AQL plan before production starts?
Yes β with the PO, before production, not when the goods are packed. A factory that knows the sample size and Ac/Re up front can run its own in-line checks against the same numbers. Springing the plan on inspection day just guarantees an argument about which standard applies.
What if my shipment has several products in it?
Treat each product as its own lot with its own plan. Different products have different defect classes and different lot sizes, so they get different code letters and samples. One blended inspection across mixed products hides a bad product inside a good average β exactly what sampling is supposed to catch.
More guides

How to Use an Auto Loan Calculator to Compare Two Offers
Two dealers can quote payments that look almost identical and still be selling you loans that cost hundreds of dollars apart. The calculator shows you where the gap hides.

How to Build a Debt Payoff Order: Avalanche vs Snowball, Step by Step
Paying extra money toward debt only works if the extra money has a target. This guide builds that target: an ordered list, made two different ways, so you can see exactly where each spare dollar goes.

How to Project Compound Growth (and Read the CAGR Mode)
This calculator does two jobs in one place: it projects a balance forward at a rate you set, and it works backwards from two balances to the steady rate that links them.